SHOW / EPISODE

AST SpaceMobile (ASTS): Building Its Own $400M Rocket [Q3 2026]

10m | Nov 10, 2026

Tired of waiting in the launch queue, AST SpaceMobile used its Q3 2026 report to announce it is building its own 20-ton reusable rocket—while omitting the $400M upfront price tag from the press release.


In ~10 minutes:

- Unpacking the $400M Firefly engine deal for the "Blacklift" rocket 🚀

- Why Japan’s $1B "non-dilutive subsidy" involves a $1.4B preferred share subscription

- Selling ground gateways at a -9.1% gross margin while inventory jumps 178%

- Pulling forward the 7nm ASIC chip to multiply satellite bandwidth 10x

- How AST plans to more than double Q3 revenue in Q4 to hit full-year guidance


Beyond validating the first live cell-tower-to-space handover with AT&T—and maneuvering a stuck satellite over Spain to warm it up so it would unfold—AST is rapidly morphing into a dual-use defense and sovereign telecom contractor. With a new $100M Space Force award and DPAS priority launch ratings, the demand is real, even as rocket CapEx and complex JV accounting raise the stakes for 2027.


Company: AST SpaceMobile, Inc. (ASTS) | Q3 FY2026

AI-assisted production. Feedback/ticker requests: https://x.com/EarnUnscripted.

Paused
Audio Player Image
Earnings Unscripted: Stock Earnings Calls & Analysis
Loading...